
PrepAwayTest C-TS413-1909 Dumps PDF - 100% Passing Guarantee
C-TS413-1909 Braindumps Real Exam Updated on Jan 08, 2022 with 143 Questions
SAP S/4HANA Asset Management Certification Exam Details:
| Passing Score | C_TS413_1909 - 64% C_TS413_1809 - 60% |
| Exam Name | SAP Certified Application Associate - SAP S/4HANA Asset Management |
| Reference Books | S4130 (SAP S/4HANA 1909) S4133 (SAP S/4HANA 1909) S4132 (SAP S/4HANA 1909) S4131 (SAP S/4HANA 1909) S4130 (SAP S/4HANA 1809) S4133 (SAP S/4HANA 1809) S4131 (SAP S/4HANA 1809) S4132 (SAP S/4HANA 1809) |
| Sample Questions | SAP S/4HANA Asset Management Certification Sample Questions |
| Exam Code | C_TS413_1909 |
| Exam Price | $550 (USD) |
| Number of Questions | 80 |
| Level | Associate |
| Duration | 180 mins |
| Schedule Exam | SAP Training |
NEW QUESTION 21
The first release of the SAP Asset Manager Mobile application is based on _______________.
- A. Windows only
- B. iOS, Android and Windows
- C. iOS only
- D. O Android only
- E. iOS and Android
Answer: C
NEW QUESTION 22
Which actions can you perform with the create technical objects SAP fiori app? choose 3 answers
- A. change a reference location
- B. create measuring point
- C. edit classification data and characteristics
- D. display asset viewer
- E. assign document
Answer: B,C,E
NEW QUESTION 23
Which of the following are mandatory parameters for a counter used for performance-based maintenance planning? choose 2 answers
- A. code group
- B. characteristics
- C. estimated annual performance
- D. counter overflow reading
Answer: B,C
NEW QUESTION 24
Which parameters are calcluated during shceduling of a performance-based maintenance plan? choose 2 answers
- A. planned date based on sum of counter readings
- B. monthly performance based on annual estimate
- C. planned date based on cycle and daily performance
- D. daily performance based on on annual estimate
Answer: C,D
NEW QUESTION 25
What are the effects when the planner release a maintenance order? choose 3 answers
- A. the planner can estimate costs
- B. the planner can print the job papers
- C. the warehouse clerk can post a goods issue
- D. the technician can record confirmations
- E. the planner CANNOT change planned costs
Answer: B,C,D
NEW QUESTION 26
Which steps in the maintenance order are directly based on data within the maintenance work center? choose 2 answers
- A. material availiability check
- B. cost calcluation
- C. capacity planning
- D. damage analysis
Answer: B,C
NEW QUESTION 27
What is the purpose of the initial and subsequent buffers in a maintenance strategy? choose 1 answer
- A. to set the start/end date of the maintenance order
- B. to set the planned date
- C. to set the start date of the maintenance plan
- D. to set the call date
Answer: A
NEW QUESTION 28
Which options do you have to allow the assingment of order operation to object list entries. choose 3 answer
- A. to all object list entries
- B. to all task list
- C. to all maintenance plans
- D. only to notifiaction created via maintenance plans
- E. to all notification
Answer: A,D,E
NEW QUESTION 29
You plan to use the integration of maintenance order and project system (PS) objects. to which PS objects can you assign a maintenance order? choose 2 answers
- A. network header
- B. network operation
- C. project definition
- D. WBS element
Answer: C,D
NEW QUESTION 30
With SAP S/4HANA embedded analytics, which tools are aimed at end users?
- A. Design Studio
- B. Analytical SAP Fiori applications
- C. Query Browser
- D. Query Designer
- E. SAP Smart Business cockpits
Answer: B,C,E
NEW QUESTION 31
How can you define the data transfer within a technical object hierarchy? choose 2 answers
- A. use the data origin function to the update the supported fields for the bill of materials
- B. use the data origin function to change the supproted for the piece of equipement
- C. use the reference functional locations for transfer data to the corresponding functional Icaotions
- D. use the data origin function to change the supported fields in the functional location
Answer: C,D
NEW QUESTION 32
When the planner checks the capacity load of work center, which data of the order is used? choose 2 answers
- A. amount of work
- B. scheduled start
- C. basic start
- D. duration of the activity
Answer: A,D
NEW QUESTION 33
Why was the application code completely rewritten for SAP S/4HANA?
- A. To ensure that the code is optimized for SAP HANA
- B. SAP S/4HANA is now built with Java
- C. To take advantage of the simpler data model
- D. The optimized ABAP code that we developed for Suite on SAP HANA would not work with SAP S/4HANA
Answer: A,C
NEW QUESTION 34
Which of the following is scheduling indicator? choose 1 answer
- A. time-fixed date
- B. time-key date
- C. time-earliest date
- D. time-latest date
Answer: B
NEW QUESTION 35
Which of the following are typical tools used by key users to develop various analyses in SAP S/4HANA Embedded analytics?
- A. Query Designer
- B. KPI builder
- C. SAP HANA Live Browser
- D. Design Studio
Answer: A,B,D
NEW QUESTION 36
Which of the following is the correct sales order management process?
- A. Sales order, picking, goods issue, billing, delivery
- B. Picking, sales order, goods issue, billing, delivery
- C. Goods issue, picking, sales order, delivery, billing
- D. Sales order, delivery, picking, goods issue, billing
Answer: D
NEW QUESTION 37
What is a caracteristics of the SAP Fiori tile group? choose 1 answer
- A. it is assigned using the set/get parameteres
- B. it is a building block of the SAP fiori catalog
- C. it provide an invisible group of SAP Fiori catalogs
- D. it shows active tiles in SAP fiori launchpad
Answer: D
NEW QUESTION 38
When the planner adds a non-stock material in the order , what are valid process steps? choose 3 answer
- A. post the goods issue
- B. post the credit memo
- C. post the goods receipt
- D. post the invoice
- E. create the purchase order
Answer: C,D,E
NEW QUESTION 39
You are planning maintenance execution on the emplyee level. Which combination of SAP objects is mandatory within SAP S/4 HANA? choose 1 answer
- A. ogranizational unit and personnel number
- B. business partenerand personnel number
- C. SAP user and personnel number
- D. planner group and personnel number
Answer: A
NEW QUESTION 40
What happens when you enter an invoice with reference to a purchase order?
- A. The system suggests data from the purchase order and the goods receipt.
- B. The system suggests data only from the purchase order.
- C. The system suggests data only from the goods receipt.
Answer: A
NEW QUESTION 41
In which object can you change the offset of a maintenance plan strategy? choose 1 answer
- A. maintenance plan category
- B. maintenance package
- C. maintenance plan item
- D. maintenance plan header
Answer: B
NEW QUESTION 42
......
SAP C-TS413-1909 Exam Description:
The "SAP Certified Application Associate - SAP S/4HANA Asset Management" certification exam verifies that the candidate has the fundamental and core knowledge in the area of Asset Management required for the consultant profile. This certificate proves that the candidate has an overall understanding and can implement the knowledge practically in projects to contribute to the success of the planning and implementation phases in a mentored role. Previous project experience is not necessarily a prerequisite to pass this exam.
C-TS413-1909 Dumps With 100% Verified Q&As - Pass Guarantee or Full Refund: https://www.prepawaytest.com/SAP/C-TS413-1909-practice-exam-dumps.html