Certification Topics of HQT-4180 Exam PDF Recently Updated Questions [Q35-Q55]

Share

Certification Topics of HQT-4180 Exam PDF Recently Updated Questions

HQT-4180 Exam Prep Guide: Prep guide for the HQT-4180 Exam


Hitachi HQT-4180 is an exam that is designed to test the knowledge and skills of professionals who are interested in installing the Hitachi Vantara VSP Midrange Family. HQT-4180 exam is an essential step for professionals who want to become Hitachi Vantara Qualified Professionals. HQT-4180 exam is intended for professionals who have experience with Hitachi VSP Midrange Family installation and configuration.


Before taking the Hitachi HQT-4180 certification exam, candidates must have a minimum of six months of experience in the installation of the Hitachi Vantara Qualified Professional - VSP Midrange Family. Candidates must also have a strong understanding of storage networking concepts, as well as experience with Fibre Channel, iSCSI, and NAS protocols.


Hitachi HQT-4180 certification exam is a valuable credential for IT professionals who want to demonstrate their expertise in the installation and configuration of Hitachi VSP Midrange Family solutions. HQT-4180 exam covers a range of topics and is suitable for professionals with practical experience in storage administration. Passing the exam is a testament to the candidate's knowledge and skills in Hitachi VSP Midrange Family installation and configuration.

 

NEW QUESTION # 35
You need to perform the "New Installation" procedure for a VSP One B26 system.
What are two prerequisites? (Choose two.)

  • A. The MPC software must be configured on your CE laptop
  • B. The SVP must be connected to the customer network
  • C. The CE hardware jumpers must be attached to both controllers
  • D. The controller hardware must be cabled and assembled

Answer: A,D


NEW QUESTION # 36
A customer wants to change a production RAID group from RAID 5 (7D+1P) to RAID 6 (6D+2P) on a VSP G600 during normal operations. They have just unmapped the LUNs from the channel ports.
What needs to be performed next?

  • A. The RAID level in the SVP Maintenance window must be changed.
  • B. The RAID level must be changed in Storage Navigator.
  • C. The RAID 5 group must be put into DRU mode in Storage Navigator.
  • D. Parity groups must be deleted.

Answer: D


NEW QUESTION # 37
Which tool can be used to change System Option Modes (SOMs)?

  • A. MPC software
  • B. Webconsole
  • C. HSAe
  • D. Hitachi Ops Center

Answer: A


NEW QUESTION # 38
Which two tools are available to configure NTP server settings on a VSP E590 system? (Choose two.)

  • A. Maintenance Utility
  • B. Storage Navigator
  • C. Initial Setup Wizard
  • D. HSA Embedded

Answer: A,C


NEW QUESTION # 39
Which two specifications may differ between models within the VSP Midrange family? (Choose two.)

  • A. number of drives supported
  • B. number of controllers
  • C. number of power supplies
  • D. number of CPUs and cores per controller

Answer: A,D


NEW QUESTION # 40
The SVP of a VSP G900 system failed and you have been asked to replace it. Which two items must be available to perform the replacement? (Choose two.)

  • A. the Hitachi Remote Ops Monitor Agent iso file
  • B. the microcode iso file with the correct software versions
  • C. the iso file with the correct version of the Windows operating system
  • D. the iso file with the correct version of Hitachi Ops Center

Answer: B,C


NEW QUESTION # 41
In the VSP Midrange family, which module provides power to the Cache Flash Memory (CFM) and to the cache in case of a power outage?

  • A. Backup Module
  • B. Power Module
  • C. Power Supply Module
  • D. Cache Module

Answer: A


NEW QUESTION # 42
A storage administrator wants to present an LDEV to a server attached to a newly installed VSP One B28 system. Two Host Groups have been created on ports CL3-A and CL4-A for this server.
Which three items should be registered in these Host Groups? (Choose three.)

  • A. LUN
  • B. Host Mode
  • C. RAID Group
  • D. WWPN
  • E. Server Name

Answer: A,B,D


NEW QUESTION # 43
Which two VSP systems support attached Drive Box Flash (DBF)? (Choose two.)

  • A. VSP E590
  • B. VSP F700
  • C. VSP G900
  • D. VSP F370

Answer: A,B


NEW QUESTION # 44
How are system logs and error messages utilized when troubleshooting VSP midrange storage systems?

  • A. They help identify hardware or software issues causing system malfunctions.
  • B. They enable remote access and monitoring of the storage systems.
  • C. They provide real-time performance data for analysis and optimization.
  • D. They offer insights into the historical usage and trends of the storage systems.

Answer: A


NEW QUESTION # 45
What is the recommended RAID level when creating a Hitachi Dynamic Provisioning (HDP) pool on a VSP E1090?

  • A. RAID 6
  • B. RAID 1+0
  • C. RAID 1
  • D. RAID 5

Answer: A


NEW QUESTION # 46
Which two actions can be performed with Hitachi Ops Center Administrator? (Choose two.)

  • A. Configure the Hitachi Remote Ops Monitor Agent.
  • B. Manage virtual storage machines.
  • C. Perform Self-Service Maintenance.
  • D. Manage multiple VSP Midrange storage systems.

Answer: A,C


NEW QUESTION # 47
The SVP of a VSP G350 system failed and you have been asked to replace it.
To perform the replacement which item do you need?

  • A. the iso file with the correct version of the SVP Windows operating system
  • B. the Hitachi Remote Ops Monitor Agent iso file
  • C. the microcode iso file with the correct software versions
  • D. a USB stick with the configuration backup

Answer: D


NEW QUESTION # 48
You need to replace a parts in a VSP E590.
What are two ways for you to invoke the Maintenance Utility? (Choose two.)

  • A. using the MPC connected to the Maintenance LAN port on the array
  • B. using the BECK tool
  • C. using HSAE
  • D. using the VSP One Block Administrator

Answer: A,D


NEW QUESTION # 49
A drive in a 3D + 1P RAID group fails in a VSP G700 and there is no spare drive available. Which two actions are automatically performed by the system? (Choose two.)

  • A. The Correction Copy process starts.
  • B. Dynamic Sparing is started.
  • C. The RAID group is placed in Correction Access.
  • D. An alert is generated.

Answer: C,D


NEW QUESTION # 50
Which two actions can be performed with Hitachi Ops Center Administrator? (Choose two.)

  • A. Configure the Hitachi Remote Ops Monitor Agent.
  • B. Manage multiple VSP Midrange storage systems.
  • C. Perform Self-Service Maintenance.
  • D. Manage virtual storage machines.

Answer: B,D


NEW QUESTION # 51
You have added several drives to a VSP E1090 and the process has failed.
What should you do first?

  • A. Use the DKU Inline Test from the MPC
  • B. Isolate the failed drives and move them to empty slots to test them
  • C. Perform a dummy replacement of the DKB
  • D. Refer to the VSP Maintenance Manual troubleshooting section

Answer: D


NEW QUESTION # 52
You are installing a VSP G350 system at a customer site.
Which tool allows you to apply the license keys?

  • A. Maintenance Utility
  • B. SVP Web Console
  • C. Storage Navigator
  • D. HCS License Key Management System

Answer: C


NEW QUESTION # 53
How many batteries does a VSP E1090 have per controller (CTL)?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: A


NEW QUESTION # 54
Which two VSP systems support attached Drive Box Flash (DBF)? (Choose two.)

  • A. VSP F700
  • B. VSP E590
  • C. VSP G900
  • D. VSP F370

Answer: A,C


NEW QUESTION # 55
......

2026 New Preparation Guide of Hitachi HQT-4180 Exam: https://www.prepawaytest.com/Hitachi/HQT-4180-practice-exam-dumps.html

HQT-4180 Practice Exam - 75 Unique Questions: https://drive.google.com/open?id=1RwHZb_oD276bJUJLbO6Akq9hfVCWHcy7

Contact Us

If you have any question please leave me your email address, we will reply and send email to you in 12 hours.

Our Working Time: ( GMT 0:00-15:00 )
From Monday to Saturday

Support: Contact now